Sunday, December 7, 2008

Excavation

Excavation of the footings began on October 14, 2008. The two large holes below are for the pedestal footings on the left side of the tea house. The smaller whole is for the center support that will also house the heat exchanger.



Once the concret for the footings was poured, forms for the pedestals were built.












































The long trench is for the power supply for the heat pump and lights.

1 comment:

Anonymous said...

thanks for the update! can't wait to see the steel!!