Sunday, April 12, 2009

Glass installed

Most of the glass was installed this past week. Two panels somehow disappeared between the glass company and Henry's shop. They should arrive in the coming week. In the front view you can see the double doors that open into the yard. There is still a tarp covering because it is not yet fully sealed.


The side view shows the entrance door. The triangle shaped pieced of wood inside are the base to the inverted pyramid ceiling.


The interior view. The metal posts hold the floor and ceiling together, and continue through the roof to the suspension beams. In the interior, the will be encased in mahogany.